We will be closed for our annual break from 24th December 2025 and will reopen on 3rd February 2026.

We will be closed for our annual break from 24th December 2025 and will reopen on 3rd February 2026.

What’s involved in planning bathroom and kitchen renovations in Sydney?

kitchen renovations

Renovating a kitchen or bathroom is exciting, but it can also feel like a big task if you are not sure where to start. These two rooms are the most used spaces in any home, so planning things the right way makes a huge difference. A well-planned renovation helps you avoid delays, budget blowouts, and design choices that don’t work for your lifestyle.

Whether you live in a classic Sydney terrace, a coastal home, or a modern apartment, the process usually follows a similar path. From early planning to final approvals, every step matters. Here is a complete breakdown of what is involved when planning bathroom and kitchen renovations in Sydney.

1. Defining your goals and lifestyle needs

Before choosing tiles, colours, or fixtures, the first step is to understand why you want to renovate in the first place. Think about what is not working right now.

For a kitchen renovation, it may be:

  • Not enough bench space
  • Poor layout
  • Lack of storage
  • Tired cabinets or old appliances

For bathroom renovation, it may be:

  • Old plumbing
  • Limited ventilation
  • Cramped layout
  • Outdated finishes

Write down what you love about the current space and what frustrates you. This gives you a clear direction before you start speaking to designers, builders, or trades.

2. Setting a realistic budget

Every renovation needs a budget. Costs vary across Sydney depending on materials, labour, structural work, plumbing, and access to the property.

Your budget will depend on:

  • Whether the layout is changing
  • If you need plumbing moved
  • The quality of fixtures and materials
  • Whether cabinetry is standard or built to order
  • Electrical upgrades
  • Waterproofing and tiling choices

It is wise to keep a buffer of around 10 to 15 percent for unexpected costs. Older Sydney homes sometimes reveal hidden issues such as water damage or outdated wiring once work begins.

3. Deciding on layout changes

A new layout can completely transform the way a kitchen or bathroom works. However, moving plumbing, gas, or walls affects both the timeline and the cost.

Kitchen layout decisions may include:

  • Switching from a closed layout to an open plan style
  • Adding an island or peninsula
  • Reworking storage with better cabinetry options
  • Improving lighting and ventilation

Bathroom layout decisions may include:

  • Changing the position of the shower or toilet
  • Upgrading to a walk in shower
  • Adding a second basin or more storage
  • Creating better drainage

In apartments, layout changes may be restricted due to strata rules, shared plumbing stacks, or structural walls. So always check before deciding.

4. Understanding Sydney regulations and approvals

Renovations in Sydney often involve council or strata regulations. The requirements depend on the type of property and the scope of work.

For houses:

Most internal renovations do not require council approval unless you are altering structural walls, windows, or external elements. Plumbing and electrical work need licensed trades.

For apartments:

Strata approval is usually needed for:

  • Waterproofing
  • Tiling
  • Plumbing work
  • Changes to structural walls
  • Noise related work

Strata committees often require detailed plans, trade licenses, and waterproofing certificates. Make sure you allow time for this step when scheduling your renovation.

5. Choosing materials, fixtures, and finishes

This is one of the most enjoyable parts of renovation planning, but also one of the most important. Your choice of materials affects durability, maintenance, and final appearance.

For kitchens, key selections include:

  • Cabinet material and finish
  • Benchtop material
  • Splashbacks
  • Sink and tapware
  • Lighting fixtures
  • Appliances
  • Storage accessories

For bathrooms, important selections include:

  • Floor and wall tiles
  • Vanity style and material
  • Shower screens
  • Tapware and mixers
  • Toilet suites
  • Bathtubs
  • Mirrors and lighting

Think about how each material performs in humid, busy spaces. For example, solid surfaces work well for benchtops, while porcelain tiles hold up well in bathrooms.

6. Planning storage and functionality

Both bathrooms and kitchens benefit from clever storage. A bathroom renovation gives you the chance to rethink how everything is organised.

Kitchen storage ideas:

  • Deep drawers for pots and pans
  • Pull out pantry systems
  • Corner solutions
  • Divider systems for cutlery and utensils
  • Overhead cabinetry to maximise height

Bathroom storage ideas:

  • Wall hung vanities
  • Mirrored cabinets
  • Built in niches for showers
  • Shelving in unused corners

Well designed storage makes everyday use smoother and keeps the space tidy.

7. Selecting the right builder or renovation team

Working with the right professionals shapes the entire renovation experience. Look for licensed, insured builders with clear communication and a strong track record in Sydney.

A reliable team will:

  • Assess the space thoroughly
  • Provide accurate quotes
  • Offer advice on layout, lighting, and practicality
  • Handle certified waterproofing
  • Coordinate trades
  • Keep you informed throughout the project

Always compare multiple quotes and ask to see previous work.

8. Mapping out the timeline

Renovations take time, especially when multiple trades are involved. Planning helps you avoid disruptions.

A typical timeline includes:

  1. Design and planning
  2. Approvals (if required)
  3. Ordering materials
  4. Removal of old fixtures
  5. Plumbing and electrical rough in
  6. Waterproofing and inspections
  7. Tiling
  8. Cabinet installation
  9. Benchtop installation
  10. Final plumbing and electrical
  11. Touch ups and cleaning

Some materials, like stone benchtops or custom cabinets, may have longer lead times, so place orders early.

9. Waterproofing and compliance

Waterproofing is essential for bathrooms and sometimes for kitchens. In Sydney, waterproofing must be done by a licensed professional, and you must receive a certificate at completion.

A proper waterproofing system prevents:

  • Leaks
  • Mould
  • Structural damage
  • Costly repairs later

Never cut corners with this step. It protects your home long term.

10. Final styling and finishing touches

Once the major work is done, the final styling brings everything together. Small details can completely shift the look and feel of the space.

You may add:

  • Plants
  • Towels and accessories
  • Decorative storage jars
  • Warm lighting
  • Soft rugs
  • Practical organisers

These touches make the kitchen or bathroom feel inviting and complete.

Final thoughts

Planning bathrooms and kitchen renovations involves a mix of design choices, practical decisions, and regulatory steps. When you take the time to plan each stage, the process becomes far smoother and the final result feels far more satisfying. Whether you are improving storage, updating fixtures, or giving your home a fresh new look, a clear plan helps you create spaces that feel comfortable, functional, and suited to daily life.

Konnect Kitchens is here to help you with the whole process. Contact us today to know more. 

You May also Like